Chelmsford Railway Bridge
This scaffold design presented a complex technical challenge, as it was my first time developing a detailed model of a railway bridge to integrate the scaffold layout. The objective was to ensure dimensional accuracy, structural compatibility, and precise alignment with the scaffold design specifications.